CIMIC Group’s UGL has been selected to install a 35-megawatt one-hour battery energy storage system (BESS) facility in Port Hedland, Western Australia for Alinta Energy.

UGL will be responsible for the design, testing and commissioning of the BESS, which consists of a battery storage and power conditioning system at the Port Hedland Power Station. UGL will also be responsible for an extension to the existing high voltage infrastructure for connection of the BESS.