Mugga Lane Solar Park

Client
Maoneng Group
Sector
Power
Expertise
  • Engineering design
  • Construction and commissioning
  • Operations and maintenance
Contract type
Country
Australia
State
Australian Capital Territory
Location
Mugga Lane, Hume
Status
Completed
Duration
Tags

UGL delivered the design and construction of the 15.3MW solar facility at Mugga Lane in the Australian Capital Territory for Maoneng Group.

UGL will provide the operations and maintenance (O&M) of the fixed and single tracking system site for a two-year period.

UGL's scope of work for this project includes:

  • project management
  • design management
  • operations and maintenance
  • construction management
  • health and safety management

Mugga Lane Solar Farm is connected to the Gilmore Substation (on Isabella Drive) via underground 11kV cables. The power generated will be distributed to ACT residents via the local electricity network.

 

Fast facts

  • CO2 emissions icon
    480,000t

    the amount of CO2 emissions the site offsets over 25 years

  • house icon
    3250

    the number of households the site will power

  • Solar power icon
    48,412

    the number of  solar panels installed at the site

  • Size of area icon
    52 hecatares

    the total size of the solar farm site