UGL delivered the design and construction of the 15.3MW solar facility at Mugga Lane in the Australian Capital Territory for Maoneng Group.

UGL will provide the operations and maintenance (O&M) of the fixed and single tracking system site for a two-year period.

UGL's scope of work for this project includes:

  • project management
  • design management
  • operations and maintenance
  • construction management
  • health and safety management

Mugga Lane Solar Farm is connected to the Gilmore Substation (on Isabella Drive) via underground 11kV cables. The power generated will be distributed to ACT residents via the local electricity network.

 