Mugga Lane Solar Park
- Client
- Maoneng Group
- Sector
- Power
- Expertise
- Engineering design
- Construction and commissioning
- Operations and maintenance
- Contract type
- Country
- Australia
- State
- Australian Capital Territory
- Location
- Mugga Lane, Hume
- Status
- Хэрэгжүүлсэн
- Duration
- Tags
UGL delivered the design and construction of the 15.3MW solar facility at Mugga Lane in the Australian Capital Territory for Maoneng Group.
UGL will provide the operations and maintenance (O&M) of the fixed and single tracking system site for a two-year period.
UGL's scope of work for this project includes:
- project management
- design management
- operations and maintenance
- construction management
- health and safety management
Mugga Lane Solar Farm is connected to the Gilmore Substation (on Isabella Drive) via underground 11kV cables. The power generated will be distributed to ACT residents via the local electricity network.