Darwin International Airport Solar Farm

Client
Northern Territories Airports Pty Ltd
Sector
Power
Expertise
  • Engineering design
  • Construction and commissioning
  • Operations and maintenance
Contract type
Country
Australia
State
Northern Territory
Location
Darwin
Status
Completed
Duration
Tags

UGL provided the design, supply and construction (EPC) services for a 4MWDC Solar Farm Stage 1 and an extension of 1.5MW (Stage 2) at Darwin International Airport.  This is the largest solar project in the Northern Territory and the largest airside PV solar system in the southern hemisphere.

The scope of works for this project included:

  • project management
  • design management
  • design services
  • construction management
  • health and safety management
  • environmental management

Darwin International Airport (DIA) is owned by Northern Territories Airports Pty Ltd (NTA). DIA had recently undertaken several developments, including a major expansion of the main terminal building. These works will increase the total electrical load of DIA, subsequently NTA was actively seeking to reduce long-term costs associated with its power requirements.

 

Fast facts

  • Size of area icon
    6ha

    the size of the solar farm site

  • house icon
    1,000

    households powered by the site

  • power icon
    25%

    of the airport's overall energy needs is generated at the solar farm

  • Solar power icon
    15,000

    Solar panels installed

X