Tangkam and Oakey Secondary Systems Replacement
UGL has been awarded the Tangkam and Oakey Secondary Systems Replacement project by Powerlink Queensland.
Details
Location
Tangkam and OakeyStatus
CurrentSector
UtilitiesExpertise
Client
Powerlink Queensland
This project reflects UGL’s steadfast commitment to delivering high-quality infrastructure solutions that drive energy reliability across Queensland. It highlights our expertise in managing essential systems with precision and consistency, reflecting the value brought to every partnership. Powerlink’s decision to partner with UGL on this project was directly attributed to UGL’s proven track record of delivering similar projects with excellence.
Delivered under Powerlink’s Substation Panel Agreement (SPA), this is a construct-only project that involves significant system replacement works across two sites situated approximately two hours west of Brisbane.s.
Scope of Work
Tangkam Substation
The scope of work at Tangkam Substation includes two major separable portions (SP1 and SP2):
· SP1: Earthworks preparation.
· SP2: Construction of foundations for new infrastructure such as a building, water tank, and generator, as well as the installation of alternating current (AC) boards, cable trench extensions, and road construction.
Oakey Substation
The work at the Oakey Substation includes:
· Construction of foundations for new buildings and primary plant equipment.
· Installation of AC boards and cables.
· Extension of trenches and drainage systems.