Cross River Rail
https://edge.sitecorecloud.io/cimicgroupl634d-cimicxmcloud-production-16eb/media/project/cimic/ugl/projects/transport/800-x-590-sydney-metro-northwest-radio-communications.png?h=590&iar=0&w=800
Sydney Metro North West Radio Communications
https://edge.sitecorecloud.io/cimicgroupl634d-cimicxmcloud-production-16eb/media/project/cimic/ugl/projects/transport/800-x-590-sydney-metro-northwest.png?h=590&iar=0&w=800
Sydney Metro 

Key projects

UGL, as part of the ActiveUs Alliance will deliver the LGC project to provide more frequent and reliable public transport services to address the high travel demand between Brisbane and the Gold Coast. 

The Alliance works include:

  • An upgrade from two to four rail tracks from Kuraby to Beenleigh, including all civil works and civil structures
  • Accessible station upgrades including park ‘n’ ride, kiss ’n’ ride and bus stop upgrades
  • Removal of level crossings
  • Upgraded rail systems and conventional signalling and enabling works for a European Train Control System (ETCS)
  • Modification of the local road network and improved walking and cycling connections along the 20-kilometre project corridor
  • Integration of the project with adjacent construction packages and into the existing rail network.
     
The first fully automated rapid transit rail system in Australia, and comprises eight new railway stations, 4,000 commuter car parks and a new high frequency single-deck train system to Sydney’s growing northwest, and will now operate NWRL’s 36km rapid transit train service for 15 years.
Line-wide Work for Sydney Metro encompasses the essential systems, services, and construction necessary for the seamless operation of the entire metro network. Systems Connect, tasked with this responsibility, will deliver key components such as metro rail tracks, power infrastructure, communications systems, and signaling across a 31-kilometer underground stretch from Chatswood to Sydenham. 
The Cross River Rail (CRR) Project comprises two main work packages: Tunnels, Stations, and Development (TSD) and Rail, Integration, and Systems (RIS). The TSD Package focuses on the underground section. This involves mechanical, electrical, and safety systems, four new underground stations, and the tunnel connecting Dutton Park station to a northern portal beyond Normanby. The RIS Package handles the design, supply, and installation of rail systems, integration into Queensland Rail's network, and surface infrastructure enhancements. 
Rail Systems delivered project-wide infrastructure for the train control, signalling, telecommunications, and information and communications technology components of the Regional Rail Link, with works spanning the entire 90km alignment and including the design and installation of technology integral to a safe, efficient and reliable train network, as well as civil construction works for a 10km area between Sunshine and Rockbank.
The Gippsland Line Upgrade will enable much-needed extra off-peak services such as track duplication, a crossing loop extension and second platforms at stations that will provide more opportunities for trains to pass each other. The project includes duplicating track, extending the Morwell crossing loop, upgrading level crossings and signalling, and adding second platforms.
The initial phase of the Canberra Metro project involved the creation of a 12km track. This stage featured the construction of a depot, signaling systems, 13 stops, and 14 Light Rail Vehicles (LRVs) operating under GoA 0. The subsequent Light Rail Stage 2A aims to provide residents with an eco-friendly transportation alternative. The expansion encompasses the design and construction of 1.7km of new track incorporating a wireless track section, three additional stops and 12 new LRVs

More about our major projects

Transport Major Projects
Transport Major projects cover