Train control systems
UGL’s train control systems are proudly Australian-made in our own facilities. They provide clients a high quality of control and adherence to the highest reliability.
Our train control systems (TCS) products integrate seamlessly with the latest and legacy rail operator technology.

SigView – your trusted rail operations system
Cost-effective: Effortlessly scale according to your specific needs reducing operational costs through optimised resource management.
Australian-made: Locally produced, ensuring high quality.
Experienced: Backed by 30 years of expertise in train control systems.
Effective incident response: Real-time alarms, logging, reporting, and replay facilities, ensuring swift response to incidents.
Operational efficiency: Enhances workflow and minimises interruptions boosting overall productivity.
Reliable performance: Consistent and dependable operation minimises downtime enhancing overall efficiency.
Interoperable: Interfaces seamlessly with both modern and legacy systems.
Type approved: Certified for production use with multiple rail operators.

Augment your solution with SigMAP
Our SigMAP™ (Signalling Multiple Access Processor) is a proven solution that enhances the capabilities of our TCS. Integrating seamlessly with distinct TCS’s, it enables robust communication with field equipment. Data processing and transmission is efficient and provides real-time insights and control over railway operations.

Performance and monitoring with IMSView
UGL’s Interlocking Maintenance System in SigView is designed and built to provide a cost effective and flexible solution to real-time monitoring, and logging of Computer Based Interlocking (CBI) systems, including live track and control panels, seamless replay, diagnostics, trending analysis and reporting.
• cost-effective
• enhanced flexibility
• proven solution
• operational efficiency
• reliable performance
• extended system life

Lab facilities
Leading the way in train control: Australia’s advanced simulation lab facilities
Our test and simulation laboratory, along with our other dedicated facilities are equipped with advanced server and workstation capabilities, designed to support all project phases, from initial tendering concepts all the way through to retirement and eventual hardware refresh maintenance requirements.

Innovations
Find out more about or innovations and integrations:
• electronic train orders
• worker on track authority
• electronic train graph
• automatic route setting